Installing a pool is one of the biggest improvements you can make to your home. Understanding the process helps set expectations and ensures a smooth experience.
Here's what Northern Utah homeowners should know about pool installation from start to finish.
Phase 1: Consultation and Design
Every pool project starts with understanding your property, your vision, and your constraints.
What happens:
- We visit your property to assess space, access, utilities, and soil conditions
- Discuss how you plan to use the pool
- Review options that fit your space and budget
- Preliminary design concepts
Timeline: 1-2 weeks for initial consultation and concept development
This phase is free and no-obligation. Our goal is to give you the information you need to make a good decision—even if that decision is to wait or not proceed.
Phase 2: Design Finalization and Permits
Once you decide to move forward, we finalize the design and handle permitting.
Design finalization includes:
- Final pool shape, size, and depth
- Equipment selection
- Decking and coping choices
- Any additional features (spas, water features, lighting)
Permitting: Northern Utah municipalities require permits for pool installation. Requirements typically include:
- Site plan showing pool location relative to property lines
- Barrier/fencing plans meeting safety codes
- Electrical plans for equipment
Timeline by area:
- Weber County: 2-4 weeks
- Davis County: 2-3 weeks
- Salt Lake County: 3-4 weeks
- Cache County: 2-4 weeks
We handle permit applications as part of our standard process. You don't need to navigate municipal offices yourself.
Phase 3: Construction
Construction timelines vary significantly based on pool type.
Precast Pool Installation
Precast pools are manufactured off-site and delivered complete.
Process:
- Excavation (1-2 days)
- Base preparation and leveling (1 day)
- Pool delivery and placement (1 day)
- Plumbing and electrical connections (2-3 days)
- Backfill and compaction (1 day)
- Decking and finishing (2-3 days)
Total timeline: As fast as 8 days after delivery
Custom Gunite Pool Installation
Gunite pools are built on-site, offering maximum customization but requiring more time.
Process:
- Excavation (2-5 days depending on size and soil)
- Steel reinforcement installation (2-3 days)
- Plumbing rough-in (1-2 days)
- Gunite application (1 day)
- Curing period (7-10 days)
- Tile and coping installation (3-5 days)
- Interior finish (plaster/pebble) (1-2 days)
- Equipment installation (2-3 days)
- Decking (5-10 days depending on scope)
- Fill and startup (1-2 days)
Total timeline: 8-16 weeks depending on complexity
Phase 4: Startup and Training
Once construction is complete, we don't just hand you the keys and disappear.
Startup includes:
- Filling the pool
- Chemical balancing
- Equipment programming and testing
- Homeowner training on daily/weekly maintenance
- Review of warranty coverage
We make sure you understand how to operate and maintain your new pool before we consider the project complete.
What to Expect During Construction
Pool construction is a significant project. Here's what to realistically expect:
Noise and activity: Excavation is loud. Equipment deliveries require large trucks. Plan for disruption during active construction phases.
Yard access: Construction equipment needs access to your backyard. Temporary fence removal is sometimes necessary. We discuss access requirements before starting.
Inspections: Municipal inspectors will visit at various stages. We coordinate all inspections—you don't need to be present.
Weather delays: Utah weather is generally cooperative for pool construction, but occasional delays happen. We build reasonable weather contingency into timelines.
Communication: We provide regular updates throughout construction. You'll always know what's happening and what's coming next.
After Installation
Your pool is complete. Now what?
First season: Expect a learning curve as you get comfortable with maintenance routines. We're available for questions.
Warranty: Our pools include warranty coverage. We'll explain exactly what's covered and for how long.
Ongoing service: We offer maintenance services if you prefer professional help with opening, closing, or regular upkeep.